Civic Issues
Topics getting the most attention in Narragansett public meetings, ranked by how frequently they are discussed.
2 issues in water utilities with medium priority
Sewer infiltration study for Congdon Street area
The town hired Beta Group for $127,725 to hunt down groundwater and stormwater leaking into the sewer system around the Congdon Street Pump Station — work tied to the sewer capacity concerns residents have raised.
Summit Road storm drainage
The council waived policy to fast-track a $124,815 repair of a 12-inch storm drain on Summit Road, and members agreed storm drains deserve more investment town-wide.